The pond lift becomes reality!

planned completion: Autumn 2025

The expansion of the upper trail park area already began last season with the Insta360 The line began its course. In autumn 2025, a new lift is to be completed that will comfortably take you to the start of the routes. We will keep you updated on the construction progress.

The pond lift starts about 200 meters next to the current lift exit (toward Gasthof Orthof) and ends slightly below the Almrauschhütte.

Total length: 1,200 meters

New Trails

The trails will be opened gradually throughout the season!

39 Terence Thrill - black single trail

Terence Thrill - a black single trail - starts at the height of the storage pond and runs as directly as possible downwards to the entrance of the pond lift. Technical sections, small gaps, and loads of speed await you!

38 Chuck NoRisk - blue single trail

Single trail fun for everyone! A blue trail that is intended to introduce beginners to the world of single trails and safely lead them to our technical tracks. The trail aims to bridge our flow trails and the red single trails, thus contributing to the progression of the riders.

33 Charlie Jibline - red Jumpline

The upper flow trail is becoming a jib line! The popular upper flow trail from the reservoir downhill is about to get even more exciting. A varied track design, playful features, and even more jumps await you.

36 Tiny Turner - blue flow trail

The first part of our new flow trail - Tiny Turner - was already opened in the fall of 2024. It is supposed to continue in the same style up to the lift entry (pond lift). Many changes of direction, cool berms, and flow guarantee included!